Heuristic Approach for n-Jobs, 3-Machines Flow Shop Scheduling Problem, Processing Time Associated With Probabilities Involving Transportation Time, Break-Down Interval, Weightage of Jobs and Job Block Criteria
| dc.contributor.author | Deepak Gupta | |
| dc.contributor.author | Samir Sharma | |
| dc.contributor.author | Seema Sharma | |
| dc.date.accessioned | 2026-02-14T05:46:41Z | |
| dc.date.available | 2026-02-14T05:46:41Z | |
| dc.date.issued | 2011 | |
| dc.description.abstract | This paper deals with a new simple heuristic algorithm for n jobs, 3 machines flow shop scheduling problem in which processing times are associated with their corresponding probabilities involving transportation time, break down interval and job block criteria. Further jobs are attached with weights to indicate their relative importance. A heuristic approach method to find optimal or near optimal sequence minimizing the total elapsed time whenever mean weighted production flow time is taken into consideration. The proposed method is very easy to understand and also provide an important tool for decision makers. A numerical illustration is also given to clarify the algorithm | |
| dc.identifier.issn | ISSN 2224-5804 (Paper) ISSN 2225-0522 (Online) | |
| dc.identifier.uri | http://davjalandhar.ndl.gov.in/handle/123456789/205 | |
| dc.language.iso | en | |
| dc.publisher | Mathematical Theory and Modeling Vol.1, No.1, 2011 | |
| dc.title | Heuristic Approach for n-Jobs, 3-Machines Flow Shop Scheduling Problem, Processing Time Associated With Probabilities Involving Transportation Time, Break-Down Interval, Weightage of Jobs and Job Block Criteria | |
| dc.type | Article |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- Heuristic Approach for n-Jobs, 3-Machines Flow Shop.pdf
- Size:
- 328.1 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: